Full metadata record
DC FieldValueLanguage
dc.contributor.authorJalili-Marandi, Vahid-
dc.date.accessioned2018-12-12T18:22:16Z-
dc.date.available2018-12-12T18:22:16Z-
dc.date.issued2016-09-12-
dc.identifier.urihttp://item.bettergrids.org/handle/1001/439-
dc.description.abstractThe IEEE 39 bus system is used to show how to import PSS/e (ver. 32) *.raw and *.dyr files into the ePHASORsim for simulation of transmission systems in the positive sequence domain.There are some modifications in this test system compared to the standard 39 bus system.The reactive part of loads at bus 4,16,18 were replaced by fixed shunt component. And the two 2-winding transformer among buses 11, 12, 13 were replaced by one 3-winding transformer. [IEEE 39 bus; Electrical Grid:Dynamic studies; Electrical Grid:PTI's PSSe; Load flow]en_US
dc.publisherOPAL-RT Technologiesen_US
dc.subjectIndustrialen_US
dc.titlePHASOR-03: ePHASORsim demo to import data files in PSS/e format (positive sequence)en_US
dc.title.alternativePower System Control; Wide Area Monitoring Protection and Controlen_US
dc.typeGrid Model Dataseten_US
grid.versionV1.0en_US
grid.publisher.urlhttps://www.opal-rt.com/support-knowledge-base/?article=AA-01424en_US
grid.formatOpalRTen_US
grid.buses39en_US
grid.generators10en_US
grid.loads19en_US
grid.feeders0en_US
grid.switches0en_US
grid.nodes0en_US
grid.formatversionRT-LAB:v11.0.8.13; ePHASORsim; Matlab 2011b - 2015a(SP1)en_US
grid.voltages0en_US
grid.climateZones0en_US
grid.branches0en_US
grid.identifier.urlhttps://www.opal-rt.com/support-knowledge-base/?article=AA-01424-
Appears in Collections:Transmission Steady State

File Description Size Format Export Browse
Model Schematic59.04 kBJPEG


User Comments

Average user rating

0.0 / 5

Rating breakdown

5
80% Complete (danger)
0%
4
80% Complete (danger)
0%
3
80% Complete (danger)
0%
2
80% Complete (danger)
0%
1
80% Complete (danger)
0%

Items in BetterGrids are protected by copyright, with all rights reserved, unless otherwise indicated.