Issue DateTitleVersionData FormatFeedersLoadsBusesGenerators
Jun-2017eHSx128 Gen3 with I/Os for OP5607: Three-Level NPC Converter with RLE LoadV1.0OpalRT0000
19-Jan-2024ELECTRIC GRID TEST CASE REPOSITORY Weather Data-Unspecified----
21-Dec-2021Electric Holding Company Areas------
8-Nov-2021Electric Retail Service Territories-ESRI-GIS----
Mar-2017Electric Ship Onboard Power SystemV1.0OpalRT0000
15-Feb-2022Electric Substations------
12-Sep-2016ENEL Distribution Grid Simulated in Real-time Without DelaysV1.0OpalRT0000
25-Nov-2014Energy Generation by State and Technology (2009)-Text-Data----
5-Jan-2019EPRI Distribution System Simulator ckt24-OPEN DSS2---
22-May-2017EPRI Distribution System Simulator ckt51OpenDSS----
29-Jul-2019EPRI Distribution System Simulator ckt7-OPEN DSS14---
18-Feb-2020EPRI_DPV_J1 1800 kW PV in 11 locations-CIM--3434-
Dec-2017Equivalencing Techniques in Wind Power Plant Modeling (Available in Hypersim)V1.0OpalRT0000
19-May-2015European Low Voltage Test Feeder-GridLabD-552-
Feb-2018Evaluation of Xd and Td Parameters of a Synchronous Machine (Available in HYPERSIM)V1.0OpalRT0000
Oct-2018Example of Co-simulation between two RTS (Hypersim and eMEGAsim)V1.0OpalRT0000
22-May-2017An Extended IEEE 118-Bus Test System With High Renewable Penetration-Other--118-
2016FACTS: Application of the Dynamic Voltage Restorer (DVR) (Available in Hypersim)V1.0Unspecified0000
Jun-2017Feasible 179-Bus - Phase 0-PTI-PSS-E--179-
Jun-2017Feasible 179-Bus - Phase 0-Other--179-