<?xml version="1.0" encoding="UTF-8"?>
<feed xmlns="http://www.w3.org/2005/Atom" xmlns:dc="http://purl.org/dc/elements/1.1/">
  <title>BetterGrids Collection:</title>
  <link rel="alternate" href="http://item.bettergrids.org/handle/1001/86" />
  <subtitle />
  <id>http://item.bettergrids.org/handle/1001/86</id>
  <updated>2026-11-13T04:39:59Z</updated>
  <dc:date>2026-11-13T04:39:59Z</dc:date>
  <entry>
    <title>Introducing the 9500 Node Test System: An Operations-Focused Distribution Model</title>
    <link rel="alternate" href="http://item.bettergrids.org/handle/1001/764" />
    <author>
      <name />
    </author>
    <id>http://item.bettergrids.org/handle/1001/764</id>
    <updated>2026-10-28T14:45:24Z</updated>
    <published>2023-01-01T00:00:00Z</published>
    <summary type="text">Title: Introducing the 9500 Node Test System: An Operations-Focused Distribution Model
Abstract: The 9500 Node Test System is a representative power system model developed as a part of the GridAPPS-D™ project to evaluate the performance of Advanced Power Applications in a real-time simulation environment. As an extension of the widely used IEEE 8500 Node Test Feeder, it is a full-size model representative of a single utility distribution system with multiple feeders. It was developed specifically to support simulations of common operational scenarios and potential future operations. The model includes multiple distribution circuits, a subtransmission system, multiple substations, behind the meter customer rooftop photovoltaics, and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages in a realistic manner. The Common Information Model is used to model the power system network to promote widespread adoption among utilities, vendors, universities, and research institutions.</summary>
    <dc:date>2023-01-01T00:00:00Z</dc:date>
  </entry>
  <entry>
    <title>GMDM-IOP Grid Model Data Management</title>
    <link rel="alternate" href="http://item.bettergrids.org/handle/1001/763" />
    <author>
      <name />
    </author>
    <id>http://item.bettergrids.org/handle/1001/763</id>
    <updated>2026-10-28T14:44:31Z</updated>
    <published>2026-02-02T00:00:00Z</published>
    <summary type="text">Title: GMDM-IOP Grid Model Data Management
Abstract: GMDM-IOP&#xD;
Official Grid Model Data Management (GMDM) profile repository used by EPRI's Vendor Forum and related tooling. This repository contains the RDFS profile artifacts, example instance data, and supporting files used for validating and demonstrating GMDM exchange profiles.</summary>
    <dc:date>2026-02-02T00:00:00Z</dc:date>
  </entry>
  <entry>
    <title>OpenSynth</title>
    <link rel="alternate" href="http://item.bettergrids.org/handle/1001/753" />
    <author>
      <name />
    </author>
    <id>http://item.bettergrids.org/handle/1001/753</id>
    <updated>2026-04-16T21:28:54Z</updated>
    <published>2024-07-25T00:00:00Z</published>
    <summary type="text">Title: OpenSynth
Abstract: The data repository is still under construction. In the mean time, Centre for Net Zero has published a Faraday's output on Zenodo. This dataset contains 10 million synthetic load profiles of trained on over 300M smart meter readings from 20K Octopus Energy UK households sampled between 2021 and 2022, and is conditioned on labels such as the:&#xD;
&#xD;
Property types: house, flat, terraced, detached, semi-detached etc&#xD;
Energy performance certificate (EPC) rating: A/B/C, D/E, F/G etc&#xD;
Low Carbon Technology (LCT) ownership: heat pumps, electric vehicles, solar PVs etc&#xD;
Seasonality: days of the week and month of the year</summary>
    <dc:date>2024-07-25T00:00:00Z</dc:date>
  </entry>
  <entry>
    <title>Ausgrid Distribution zone substation data</title>
    <link rel="alternate" href="http://item.bettergrids.org/handle/1001/733" />
    <author>
      <name />
    </author>
    <id>http://item.bettergrids.org/handle/1001/733</id>
    <updated>2025-07-02T15:54:06Z</updated>
    <published>2024-11-30T00:00:00Z</published>
    <summary type="text">Title: Ausgrid Distribution zone substation data
Abstract: Ausgrid operates a network with over 180 zone substations. These substations form the boundary between the sub-transmission network and the distribution (11kV) network. In accordance with the National Electricity Rules Chapter 5 (Rule 5.13A), Ausgrid is making available historical interval demand data (in Megawatts) for all zone substations not subject to third party privacy concerns. Please refer to the Australian Energy Market Commission for further information on this rule.&#xD;
&#xD;
Each year, within 30 business days of the publication of our Distribution and Transmission Annual Planning Report, Ausgrid will provide 12 months worth of interval data in .csv format. The Reporting Year (as defined in Rule 5.13A) will be from May to May (i.e the 2015/16 data will cover the period May 2015 to April 2016).</summary>
    <dc:date>2024-11-30T00:00:00Z</dc:date>
  </entry>
</feed>

